Alcohol wet milling of calcium hydroxide and apatite
Alcohol wet milling of calcium hydroxide and apatite. Calcium hydroxide: D50 4.31 µm, D90 8.37 µm; apatite: D50 1.91 µm, D90 3.48 µm; each at 2.5 hours.
PLANETARY BALL MILLS
Explore the material, the setup and the measured result.
117 sample trials
Alcohol wet milling of calcium hydroxide and apatite. Calcium hydroxide: D50 4.31 µm, D90 8.37 µm; apatite: D50 1.91 µm, D90 3.48 µm; each at 2.5 hours.
Ferrite powder: recorded D50 reduction from 3.5 to 0.6 µm. D50 = 0.6 µm; D90 = 3.3 µm after two hours of milling.
Two slag samples meet a recorded specific-surface-area objective. Fly-ash slag: 862.489 m²/kg at ten minutes; manganese slag: 916.314 m²/kg at 30 minutes, units from the objective.
Air-cooled ammonium-bicarbonate wet milling to D50 9.4 µm. D50 = 9.4 µm; D90 = 18.2 µm at 60 minutes; later 20-minute extension unmeasured.
Diamond powder: measured reduction during a one-hour planetary trial. Planetary sample at 60 minutes: D50 = 0.6 µm; D90 = 2.48 µm.
Licorice reaches powder form and complete 50-mesh passage in a planetary trial. Planetary stage at 60 minutes: powder formed; complete passage through a 50-mesh sieve.
Quartz sand dry milling to an accepted D50 endpoint. D50 = 12.3 µm; D90 = 30.5 µm at 150 minutes.
Kaolin wet milling with a mixed zirconia-ball charge. D90 = 1 µm in the result field; total recorded run 50 minutes, exact sample association unspecified.
Air-cooled green-tea trials meet a D60 objective. Sample 1: D60 = 8.9 µm; sample 2: D60 = 11.3 µm at their recorded later checkpoints.
Carbon powder meets a D90 interval in a short dry planetary trial. D50 = 3.2 µm; D90 = 7.29 µm after 30 minutes.
Silica and glass mixture: mixing with progressive particle-size reduction. D90 = 9.7 µm, recorded 180-minute checkpoint.
Nickel-powder flaking: recorded attainment after separate twenty-four-hour planetary trials. Convert the powders to flake morphology.
Results apply to the sample and conditions tested. Review each record for its setup and measurement notes.
Engineers will confirm suitability and test arrangements.
Request a sample trial