Skip to content
TENCANPLANETARY BALL MILLS

Technical article

Mill Capacity and Sample Load: What to Confirm

Separate nominal mill capacity, jar volume and the amount of material in your actual batch.

Mill Capacity and Sample Load: What to Confirm

Three different quantities.

Separate the nominal equipment capacity, the volume of each jar and the amount of sample you need to process. These are not interchangeable descriptions.

Give the working requirement.

State the mass or volume per run, the starting form and number of samples. Share bulk density if known. The jar, media and working space must be considered together.

Confirm a configuration.

Ask an engineer to confirm the usable loading arrangement for your sample. Avoid converting a catalog capacity directly into an assumed sample mass.

Work through the selection guide, or discuss a sample evaluation.

FROM INSIGHT
TO YOUR NEXT TEST.

Discuss your material, target result and milling conditions with TENCAN.

Discuss a sample trial

Discuss your project.

Tell us about your material, equipment or service needs.